web analytics

Update update

Image from pixabayIn exactly four weeks from today we will take possession of our new home on the Saanich peninsular north of Victoria.

If we are fortunate – and our experiences of late seem to suggest that frequently we are so – then our goods and chattels – which have been bobbing their merry way across two oceans – should put in an appearance at roughly the same time.

We have, in fact, heard from our tranter – Bournes International Moves – that the vessel that is playing host to our container is due to make landfall in Vancouver on or around September 4th or 5th. Whereas that should leave plenty of time for our precious cargo to reach us before we complete the house purchase it must first clear Canadian customs – a process in which we need apparently have some personal involvement, the details of which we will learn more about in due course.

Should this cause only a minor delay then our goods must needs briefly be held in storage in Vancouver before making the final leg of the journey to Victoria. This has already been factored in and the necessary arrangements made to cover all eventualities.

I have previously made reference to the fact that our new home – though really in very good condition – is in need of some updating, mostly to bring it into the current century in terms of style and convenience.

Our current wish list of improvements includes the following – in no particular order:

  • A new kitchen
  • Complete renovation of the family bathroom (mine!)
  • Extension and renovation of the ensuite bathroom (the Girl’s)
  • Connection to the natural gas main (we want a gas range and gas water heating)
  • A modern gas fireplace for the living room
  • Hardwood flooring in the living room and bedroom (the Girl does not tolerate carpets well)
  • Installation of a new staircase to give better access from the living rooms to the garden. (This will also involve opening up one of the current external walls at the foot of the new staircase and the installation of new patio doors to the ground floor in its place)
  • In conjunction with the above – the re-siting and re-commissioning of the hot tub (come on – this is Canada!)
  • The creation from the downstairs family room, kitchen and bedroom of a new studio apartment for our guests to use (and for possible future Air-B & B-ing)

I feel sure that there will also be many other things to do, but that’s about all I can think of at the moment. Besides – that’s quite enough to be getting on with.

Though we are blessed with wonderful friends in Saanichton who put up without complaint with our squatting in their suite and imposing on their hospitality, we are reaching the limit of our patience with living out of suitcases. The next four weeks of limbo-living will probably fly by, but we are now increasingly impatient for them so to do.

Tags: , , ,

2 comments

  1. Scott Menzies’s avatar

    Do you have to go through the same process of getting planning permissions etc when improving properties in Canada?

    Scott

    1. admin’s avatar

      Hi Scott

      Just sitting down to add another post!

      Planning? Yes – but not quite the same. Few buildings here are very old so no worries about conservation. Most of the updates we are considering won’t require permission, but in theory doing things like adding a staircase or putting in a fire does need Building Code approval. I am also aware that the Canadian west coast ethos is quite widely to blythely ignore such things.

      We will doubtless seek approval!

      How do you like the new job?

      Cheers

      Andy

Comments are now closed.