Two weeks into our renovation project and good progress is being made – though not all such will be immediately apparent to the quick glance.
First appearances, for example, would suggest that the kitchen is practically unchanged from its state of a week ago – whereas in fact much has been done. The gas feed for the range has been run in; the plumbing for the sink and dishwasher laid on; the electrics for lighting, appliances and so forth installed; and the extraction facilities for the range hood put in place.
The kitchen is actually very nearly ready for the drywaller to come in and to make it look like a real room again.
Similar progress has been effected in the bathrooms, for which first fix plumbing, electrics and extraction have been completed.
At one point it looked as though we may have found ourselves waiting for more than ten weeks for the delivery of our bath tubs, such being the current shortage in north America of the model that we (and clearly others) have chosen.
Mine is the larger of the two tubs (I have expressed before my feelings regarding the diminutive size of many Canadian bathtubs) and we were concerned that it might prove difficult to source. As it turns out we were most pleasantly surprised when it was delivered within a couple of weeks of an order having been placed, enabling our plumber to crack on with the installation.
Acquisition of the other tub promised to be a more difficult proposition and I thought it a good idea to visit the other bathroom equipment wholesalers in Victoria to see if anyone had an alternative that would do the job. To my great delight the second supplier that I tried had in their warehouse one (and one alone!) of the very tubs that we were seeking. It was duly delivered the very next day and installed forthwith.
In addition to the above mentioned construction tasks good progress has been made with the stripping of the ‘popcorn’ from the ceilings and on the laying of a new sub-floor – that which had been uncovered during the demolition phase being deemed unsuitable on its own for the task of carrying our splendid new flooring.
There have been times when our humble abode seems to have been hosting an apparently never-ending round of tradesmen. Our contractor and his young accomplice (or two) are constants; the electrician and his two sidekicks have done a number of days to complete their first fix; the gas fitter and his mate have done likewise; the plumber has worked alone but is a large enough character that he more than makes up for it; and the roofer (who put in the extractor vents) came and went before I knew it.
Add to this multitude the man from the flooring company and the window supplier and you will get an idea just how busy the place has been. We have not yet seen the drywaller, the kitchen cabinet installers, the counter-top templaters (and installers) or the roof insulators.
What a merry throng; all appropriately dedicated – it would seem – to the creation of our splendid new home…
Tags: House, Renovation
Recent Comments