In the drama that is our ongoing renovation the first two acts are over and there is now a brief intermission before act three. The tearing out has been completed and the loaded bin (skip) of detritus has been hauled up onto its truck and trundled away. The new infrastructure has been installed; wiring, plumbing, gas, ventilation, sub-floors, windows and so forth…
We now stretch our legs gratefully and pop to the bar for a swift sticky whilst we await the fireworks of the cosmetic part of the project that start the second half.
The shell of the kitchen is ready for dry-walling and flooring:
The drawing room awaits its new ceiling and floor:
The bathrooms are also ready for the dry-waller:
Some of the new windows have even been trimmed, though others must wait for further finishing:
The dry-waller comes on Monday to start on the walls and ceilings. The following week sees both the flooring and the tiling done and we will then be ready for the installation of kitchen cabinets and bathroom fittings.
All most exciting!